This project involved placing 10,000 Mt of Heavy Duty Asphalt, aswell as installing a ACO StormBrixx® stormwater management system. Gazzola was able to complete this project on time.
This project required the supply and placement of asphalt pavement for the purpose of emergency road raising works along Lakeshore Avenue and Cibola Avenue on the Toronto Islands.
Gazzola was responsible for the resurfacing over forty roadways in Milton. Gazzola performed localized curb, sidewalk, bus pad improvements, catch-basin/maintenance hole adjustments/replacements as required.