2021 Milton Asphalt Overlay

Posted in In Action

Gazzola was responsible for the removal of asphalt and placement of 38,000 MT of asphalt on the roadways in Milton. Gazzola performed localized curb, sidewalk, bus pad improvements, catch-basin/maintenance hole adjustments/replacements as required. While completing this work Gazzola managed traffic using detailed traffic plans as all locations required maintaining both vehicular and pedestrian traffic through the work zone. Four traffic staging plans were used to ensure the traffic was able to flow through the work zone effectively at all times while the work was being completed. Gazzola completed Thompson Road, Clark Boulevard and Trudeau Drive top course asphalt using echelon paving. This project was completed on schedule.